Civil Stormwater & Car Park Subgrades by DL Civil
DL Civil emblemSydney CBD & Metro | Civil Construction

Civil Stormwater & Car Park Subgrades

Reinforced concrete hardstand breakout, deep OSD stormwater trenching, concrete recycling, and AS 3798 compacted car park subgrades.

ScopeSlab Breakout, OSD & Subgrade
Primary Plant14.5t Hammer + Kubota SVL75
Waste Diversion100% Concrete Recycled
Sign-OffFirst-Pass Compaction Test

1. Site Challenge

An active Sydney commercial precinct required removal of a heavily reinforced concrete car park slab, deep on-site detention (OSD) stormwater trenching around live utilities, and rapid roadbase reinstatement.

2. Engineering Method & WHS Controls

Following Before You Dig Australia (BYDA) verification and live-service pot-holing, DL Civil broke out the existing slab with a silenced hydraulic hammer on our 14.5t Case, segregated steel and concrete rubble for Sydney recycling facilities, excavated the stormwater pits and OSD footprint, and back-loaded DGB20 roadbase compacted to AS 3798 specification.

3. DL Civil Plant Deployed

  • 14.5t Case Excavator with silenced hydraulic hammer & compaction wheel
  • Kubota SVL75 Posi Track with 4-in-1 bucket, pallet forks & sweeper
  • Isuzu 1400 Beavertail Float for rapid plant mobilisation
  • 6x4 Bogie Tippers (concrete rubble out, DGB20 roadbase in)

4. Programme Outcome

Zero WHS incidents on a live commercial site, 100% of broken concrete diverted to recycling, and the reinstated car park subgrade passed geotechnical compaction testing on the first inspection.

SYDNEY METRO | CIVIL PRODUCTION FOOTAGE Project field footage: Civil Stormwater & Car Park Subgrades
Civil Stormwater & Car Park Subgrades secondary site photo
Call 0450 800 006 Get Fast Quote