Civil Stormwater & Car Park Subgrades
Reinforced concrete hardstand breakout, deep OSD stormwater trenching, concrete recycling, and AS 3798 compacted car park subgrades.
1. Site Challenge
An active Sydney commercial precinct required removal of a heavily reinforced concrete car park slab, deep on-site detention (OSD) stormwater trenching around live utilities, and rapid roadbase reinstatement.
2. Engineering Method & WHS Controls
Following Before You Dig Australia (BYDA) verification and live-service pot-holing, DL Civil broke out the existing slab with a silenced hydraulic hammer on our 14.5t Case, segregated steel and concrete rubble for Sydney recycling facilities, excavated the stormwater pits and OSD footprint, and back-loaded DGB20 roadbase compacted to AS 3798 specification.
3. DL Civil Plant Deployed
- 14.5t Case Excavator with silenced hydraulic hammer & compaction wheel
- Kubota SVL75 Posi Track with 4-in-1 bucket, pallet forks & sweeper
- Isuzu 1400 Beavertail Float for rapid plant mobilisation
- 6x4 Bogie Tippers (concrete rubble out, DGB20 roadbase in)
4. Programme Outcome
Zero WHS incidents on a live commercial site, 100% of broken concrete diverted to recycling, and the reinstated car park subgrade passed geotechnical compaction testing on the first inspection.