Commercial Bulk Earthworks & Spoil Haulage by DL Civil
DL Civil emblemSouth Sydney & Banksmeadow | Bulk & Detailed Excavation

Commercial Bulk Earthworks & Spoil Haulage

Multi-machine commercial bulk cut-out, sandstone benching, and high-frequency 6x4 bogie tipper haulage dispatched from Banksmeadow.

Package ScopeMulti-Tier Bulk Basement Cut
Primary Plant30t Kobelco + 14.5t Case
HaulageContinuous 6x4 Bogie Cycles
ComplianceEPA Weighbridge Tip Dockets

1. Site Challenge

A multi-level commercial build in South Sydney needed rapid bulk excavation and multi-tier benching ahead of piling rig mobilisation, with strict council traffic management windows and full NSW EPA waste classification tracking.

2. Engineering Method & WHS Controls

DL Civil staged a 30t Kobelco SK300 on bulk load-outs alongside our 14.5t Case short-radius excavator for perimeter benching and detailed batter trim. Because our 3 Anderson St, Banksmeadow yard is minutes away, we kept continuous 6x4 bogie tipper cycles rolling without street queuing and issued full weighbridge tipping dockets for every load.

3. DL Civil Plant Deployed

  • 30t Kobelco SK300 Bulk Excavator (enclosed cab, VOC operator)
  • 14.5t Case Short-Radius Excavator for detail benching
  • Continuous 6x4 Bogie Tipper (10-Wheeler, ~12.5t GVM) haulage fleet
  • In-house float & rapid attachment support from Banksmeadow

4. Programme Outcome

Full bulk cut volume cleared on programme with 100% documented EPA weighbridge dockets, handing over a clean, level piling platform ready for the structural contractor.

30T KOBELCO SK300 | BULK LOAD-UP FOOTAGE Project field footage: Commercial Bulk Earthworks & Spoil Haulage
Commercial Bulk Earthworks & Spoil Haulage secondary site photo