1. Site Challenge

Like many Inner West and Randwick federation terraces, this property had a narrow side passage under 1.1 metres wide, overhead eaves, and a concealed sandstone shelf across the deep end of the pool footprint. Standard bogie tippers could not reverse onto the street frontage.

2. Engineering Method & WHS Controls

We mobilised our 1.7t Yanmar excavator with retracted tracks (~980mm) and removable ROPS cab roof, protecting the existing front path and council kerb with heavy ground protection mats. Every pool wall, bench step, and deep-end transition was cut square to laser survey RL levels, while 3t and 6t tight-access tippers cycled spoil out cleanly to keep the street clear for neighbours.

3. DL Civil Plant Deployed

  • 1.7t Yanmar Excavator (retractable tracks, removable cab roof)
  • 3.5t Hitachi Zero-Swing Excavator for front driveway boxing
  • Hydraulic Rock Hammer & Narrow Trenching Buckets
  • 3t & 6t Tight-Access Tippers with clean street wash-down

4. Programme Outcome

The concrete pool shell was trimmed square to engineer depth with zero over-excavation, allowing the steel fixers to start the next morning. The front driveway subgrade was boxed and compacted ready for formwork.